We used our expertise in 3D seismic and static planning coupled with tools installation to transform dining rooms and offices to a fully functional fabrication area. This complete with SubFab and a clean room.
In this round the clock project, we integrated a complete structure with fire protection and process mechanical systems, at the highest level of professionalism.
Design, fabrication and erection.
Sami Najami seamlessly provided concrete, waterproofing, steel and process mechanical piping.
In the first of its kind in Israel, Sami Najami broke the mold and constructed a 5000 sqm2 office building in two weeks. The 30m beams were without columns and their installation and erection is unique, nationwide.
With modernization high on the agenda, we were able to use all advancing and ongoing planning 3D tools, as the project progressed.
At record speed and at optimal safety levels, a complete demolition of an LC5 building.
By utilizing OSM practices, we were able to build and install a Chiller plant with cooling tower with just two weeks working at site.
Precision fabrication and erection of a landmark pedestrian bridge. Delivering structural innovation and seamless community linkage between Carmei Gat and the stadium complex at the highest level of professionalism.
Flawless fabrication and erection of complete truss modules for the Intel Sparrow Project. Delivering structural excellence and end-to-end precision at the highest level of Execution.
Construction of custom-made transformer rooms for the Israel Electric Company. Delivering specialized, site-ready electrical infrastructure with exacting standards and reliable performance.
CIVIL & INDUSTRIAL
Construction of a complete industrial factory complex in the Bar Lev Industrial Area. Delivering civil and industrial buildings with structural strength, operational durability.
Wet and dry fire-extinguishing systems for a chemical facility at Intel Kiryat Gat. Delivering complete protection across 47,000 m² with uncompromising safety and precision.